Advanced Navigation Plant

Larger manufacturing facility with dedicated integration zones for autopilot calibration and sensor-array alignment. Structural framing supports expanded hull-plating and reinforced-bulkhead inventory for simultaneous builds.
Level2
Build Cost2,745,000 cr
Build Time250s
Labor80
Power Draw2
Life Support Draw1
Navigation ArrayAssemblyAdvancedNavigation PlantNavigation SystemsWorksIntegratedNavigation Complex
OutputBuild Navigation Array
Crafting Time135s
ItemQuantity
Autopilot Module1
Navigation Core1
Sensor Array1
ItemQuantity
Navigation Array1
MaterialQuantity
Steel Plate5650
Copper Piping2500
Structural Frame2000
Control Node600
Hull Plating2050
Reinforced Bulkhead1300
View JSON Data
[{"item_id":"aluminum_ore","quantity":145000},{"item_id":"copper_ore","quantity":21900},{"item_id":"fluorine_gas","quantity":600},{"item_id":"gold_ore","quantity":1200},{"item_id":"iron_ore","quantity":96500},{"item_id":"nickel_ore","quantity":4000},{"item_id":"silicon_ore","quantity":8600},{"item_id":"silver_ore","quantity":1200},{"item_id":"titanium_ore","quantity":24750},{"item_id":"tungsten_ore","quantity":62200}]