Yellowcake Plant

Larger multi-stage leaching facility with dual extraction chambers, extensive lead shielding, and radiation-hardened instrumentation. Accelerates concentrate production through parallel processing and solvent recycling.
Level2
Build Cost316,000 cr
Build Time230s
Labor22
Power Draw2
Life Support Draw1
Uranium Leach PadYellowcake PlantUranium OreProcessorIndustrial UraniumMill
OutputConcentrate Uranium
Crafting Time13.8s
ItemQuantity
Uranium Ore6
ItemQuantity
Uranium Concentrate2
MaterialQuantity
Steel Plate1350
Copper Piping750
Structural Frame500
Control Node200
Lead Shielding900
Radiation-Hardened Circuit350
View JSON Data
[{"item_id":"aluminum_ore","quantity":3600},{"item_id":"copper_ore","quantity":6050},{"item_id":"fluorine_gas","quantity":550},{"item_id":"gold_ore","quantity":400},{"item_id":"iron_ore","quantity":10800},{"item_id":"lead_ore","quantity":7200},{"item_id":"nickel_ore","quantity":1000},{"item_id":"radium_ore","quantity":700},{"item_id":"silicon_ore","quantity":2550},{"item_id":"silver_ore","quantity":400},{"item_id":"titanium_ore","quantity":550},{"item_id":"tungsten_ore","quantity":6550}]