Industrial Uranium Mill

Cutting-edge multi-chamber facility with adaptive leaching cycles, regenerative chemical loops, comprehensive lead shielding, and automated hazmat management. Achieves maximum uranium concentrate yield at continuous rates with flawless safety records.
Level4
Build Cost3,026,000 cr
Build Time400s
Labor54
Power Draw6
Life Support Draw1
Uranium Leach PadYellowcake PlantUranium OreProcessorIndustrial UraniumMill
OutputConcentrate Uranium
Crafting Time13.8s
ItemQuantity
Uranium Ore6
ItemQuantity
Uranium Concentrate2
MaterialQuantity
Steel Plate2550
Copper Piping1500
Reinforced Frame1500
Control Node450
Lead Shielding5650
Radiation-Hardened Circuit2500
Hazmat Container1250
Coolant Loop1150
View JSON Data
[{"item_id":"aluminum_ore","quantity":86900},{"item_id":"carbon_ore","quantity":27000},{"item_id":"copper_ore","quantity":34650},{"item_id":"fluorine_gas","quantity":2950},{"item_id":"gold_ore","quantity":900},{"item_id":"helium_ice","quantity":2300},{"item_id":"iron_ore","quantity":116300},{"item_id":"lead_ore","quantity":60200},{"item_id":"nickel_ore","quantity":51000},{"item_id":"nitrogen_ice","quantity":4600},{"item_id":"radium_ore","quantity":5000},{"item_id":"silicon_ore","quantity":14950},{"item_id":"silver_ore","quantity":900},{"item_id":"titanium_ore","quantity":8450},{"item_id":"tungsten_ore","quantity":65100},{"item_id":"water_ice","quantity":2300}]