Void Crystallization Plant

Heavy-duty mass-production facility featuring extensive coolant loops and multiplied plasma injection points for sustained high-volume output. The massive heat sink array enables near-continuous operation with minimal thermal stress.
Level3
Build Cost4,453,000 cr
Build Time430s
Labor53
Power Draw4
Life Support Draw1
Void CompressionCellResonanceContainment LabVoidCrystallizationPlantAbyssSolidificationEngine
OutputCrystallize Void Essence
Crafting Time72s
ItemQuantity
Focused Crystal1
Void Condensate2
ItemQuantity
Void Crystal1
MaterialQuantity
Steel Plate5450
Copper Piping2500
Reinforced Frame1750
Control Node900
Heat Sink4150
Plasma Injector1250
Coolant Loop2550
View JSON Data
[{"item_id":"aluminum_ore","quantity":128650},{"item_id":"carbon_ore","quantity":31500},{"item_id":"copper_ore","quantity":87450},{"item_id":"fluorine_gas","quantity":900},{"item_id":"gold_ore","quantity":1800},{"item_id":"helium_ice","quantity":5100},{"item_id":"iridium_ore","quantity":1250},{"item_id":"iron_ore","quantity":119250},{"item_id":"nickel_ore","quantity":59500},{"item_id":"nitrogen_ice","quantity":10200},{"item_id":"palladium_ore","quantity":2500},{"item_id":"plasma_residue","quantity":2500},{"item_id":"silicon_ore","quantity":19900},{"item_id":"silver_ore","quantity":11800},{"item_id":"titanium_ore","quantity":9400},{"item_id":"tungsten_ore","quantity":72800},{"item_id":"water_ice","quantity":5100}]