Tracking Mine Launcher Forge

Industrial-scale production employing robotic warhead integration, precision sensor-array alignment, and automated targeting-computer calibration with environmental stress testing for autonomous pursuit verification.
Level3
Build Cost7,183,000 cr
Build Time330s
Labor39
Power Draw4
Life Support Draw1
Mine LauncherAssembly LineTracking MineLauncher WorkshopTracking MineLauncher ForgeTracking MineLauncher Foundry
OutputBuild Tracking Mine Launcher
Crafting Time120s
ItemQuantity
Circuit Board6
Sensor Array2
Titanium Alloy5
Tracking System2
Warhead Assembly2
Weapon Housing1
ItemQuantity
Tracking Mine Launcher1
MaterialQuantity
Steel Plate4850
Copper Piping2350
Reinforced Frame1400
Quantum Control Core750
Weapon Housing3300
Barrel Assembly2500
Targeting Computer1250
View JSON Data
[{"item_id":"aluminum_ore","quantity":174800},{"item_id":"carbon_ore","quantity":25200},{"item_id":"copper_ore","quantity":49650},{"item_id":"energy_crystal","quantity":5000},{"item_id":"fluorine_gas","quantity":16500},{"item_id":"gold_ore","quantity":6000},{"item_id":"iron_ore","quantity":116450},{"item_id":"nickel_ore","quantity":47600},{"item_id":"palladium_ore","quantity":1250},{"item_id":"platinum_ore","quantity":4000},{"item_id":"quantum_fragments","quantity":1500},{"item_id":"silicon_ore","quantity":33700},{"item_id":"silver_ore","quantity":3000},{"item_id":"titanium_ore","quantity":28400},{"item_id":"tungsten_ore","quantity":86700}]