Tracking Computer I Production Lab

Multi-stage facility with dedicated stations for processing-core insertion, sensor array calibration, and circuit-board integration, featuring in-process quality gates that verify tracking accuracy before final packaging.
Level2
Build Cost1,630,000 cr
Build Time140s
Labor12
Power Draw2
Life Support Draw1
Tracking ComputerI WorkshopTracking ComputerI Production LabTracking ComputerI AssemblyFacilityTracking ComputerI Technology Nexus
OutputBuild Tracking Computer I
Crafting Time82.5s
ItemQuantity
Circuit Board2
Processing Core1
Tracking System1
ItemQuantity
Tracking Computer I1
MaterialQuantity
Steel Plate3650
Copper Piping1750
Structural Frame1250
Control Node400
Processing Core800
Sensor Array950
View JSON Data
[{"item_id":"aluminum_ore","quantity":16000},{"item_id":"copper_ore","quantity":16250},{"item_id":"energy_crystal","quantity":1900},{"item_id":"fluorine_gas","quantity":5350},{"item_id":"gold_ore","quantity":800},{"item_id":"iron_ore","quantity":26900},{"item_id":"krypton_gas","quantity":1900},{"item_id":"neon_gas","quantity":1900},{"item_id":"nickel_ore","quantity":2500},{"item_id":"palladium_ore","quantity":950},{"item_id":"platinum_ore","quantity":1600},{"item_id":"silicon_ore","quantity":12750},{"item_id":"silver_ore","quantity":800},{"item_id":"titanium_ore","quantity":5350},{"item_id":"tungsten_ore","quantity":18250}]