Thermal Smartbomb Workshop

Increased throughput through parallel assembly stations and enhanced structural framing. Multiple weapon housing and barrel assembly streams feed thermal smartbomb integration with improved heat sink coordination.
Level2
Build Cost1,508,000 cr
Build Time250s
Labor22
Power Draw2
Life Support Draw1
Thermal OrdnanceAssembly LineThermal SmartbombWorkshopThermal SmartbombForgeThermal SmartbombFoundry
OutputBuild Thermal Smartbomb
Crafting Time72s
ItemQuantity
Ceramite Plating4
Heat Sink2
Plasma Injector2
Sensor Array1
Weapon Housing1
ItemQuantity
Thermal Smartbomb1
MaterialQuantity
Steel Plate6500
Copper Piping3050
Structural Frame2750
Control Node800
Weapon Housing2650
Barrel Assembly1850
View JSON Data
[{"item_id":"aluminum_ore","quantity":90050},{"item_id":"copper_ore","quantity":44750},{"item_id":"fluorine_gas","quantity":800},{"item_id":"gold_ore","quantity":1600},{"item_id":"iron_ore","quantity":60500},{"item_id":"nickel_ore","quantity":5500},{"item_id":"silicon_ore","quantity":11800},{"item_id":"silver_ore","quantity":1600},{"item_id":"titanium_ore","quantity":7950},{"item_id":"tungsten_ore","quantity":46950}]