Target Painter I Production Lab

Expanded production facility with structural frames and increased processing capacity for faster sensor and circuit integration. Parallel assembly of marking and control subsystems increases throughput substantially.
Level2
Build Cost869,000 cr
Build Time140s
Labor12
Power Draw2
Life Support Draw1
Target Painter IWorkshopTarget Painter IProduction LabTarget Painter IAssembly FacilityTarget Painter ITechnology Nexus
OutputBuild Target Painter I
Crafting Time45s
ItemQuantity
Circuit Board3
Focused Crystal1
Sensor Array1
ItemQuantity
Target Painter I1
MaterialQuantity
Steel Plate1950
Copper Piping900
Structural Frame650
Control Node250
Processing Core450
Sensor Array450
View JSON Data
[{"item_id":"aluminum_ore","quantity":8700},{"item_id":"copper_ore","quantity":8500},{"item_id":"energy_crystal","quantity":900},{"item_id":"fluorine_gas","quantity":2950},{"item_id":"gold_ore","quantity":500},{"item_id":"iron_ore","quantity":14250},{"item_id":"krypton_gas","quantity":900},{"item_id":"neon_gas","quantity":900},{"item_id":"nickel_ore","quantity":1300},{"item_id":"palladium_ore","quantity":450},{"item_id":"platinum_ore","quantity":900},{"item_id":"silicon_ore","quantity":6900},{"item_id":"silver_ore","quantity":500},{"item_id":"titanium_ore","quantity":2950},{"item_id":"tungsten_ore","quantity":9700}]