Reinforced Hull Works

An integrated facility combining plating shears, bonding presses, and shield-emitter calibration stations to produce reinforced bracing at higher throughput. Copper piping runs coolant through the bonding zones.
Level2
Build Cost433,000 cr
Build Time250s
Labor22
Power Draw2
Life Support Draw1
Hull PlatingBonding LineReinforced HullWorksAutomated HullReinforcementPlantAdvanced HullReinforcementFactory
OutputBuild Hull Reinforcement II
Crafting Time16.5s
ItemQuantity
Durasteel Plate3
Flex Polymer2
Hull Plating2
ItemQuantity
Hull Reinforcement II1
MaterialQuantity
Steel Plate400
Copper Piping200
Structural Frame150
Control Node50
Shield Emitter150
Shield Matrix100
View JSON Data
[{"item_id":"aluminum_ore","quantity":1450},{"item_id":"argon_gas","quantity":200},{"item_id":"carbon_ore","quantity":1200},{"item_id":"copper_ore","quantity":1700},{"item_id":"energy_crystal","quantity":600},{"item_id":"fluorine_gas","quantity":350},{"item_id":"gold_ore","quantity":500},{"item_id":"iridium_ore","quantity":300},{"item_id":"iron_ore","quantity":2850},{"item_id":"nickel_ore","quantity":500},{"item_id":"palladium_ore","quantity":750},{"item_id":"silicon_ore","quantity":1350},{"item_id":"silver_ore","quantity":2500},{"item_id":"titanium_ore","quantity":350},{"item_id":"tungsten_ore","quantity":1850}]