Precision Control Works

State-of-the-art facility with dual coolant loop systems and heavy reinforced framing managing ultra-precise conductor deposition. Simultaneous multi-station assembly of circuit integration, wiring harnesses, and logic calibration at peak throughput.
Level4
Build Cost3,713,000 cr
Build Time420s
Labor40
Power Draw6
Life Support Draw1
Control NodeAssembly LineControl NodeProduction PlantAutomation ControlComplexPrecision ControlWorks
OutputAssemble Control Node
Crafting Time12s
ItemQuantity
Circuit Board2
Copper Wiring4
Gold Wiring1
Silver Wiring1
ItemQuantity
Control Node2
MaterialQuantity
Steel Plate4150
Copper Piping2500
Reinforced Frame2950
Control Node850
Coolant Loop2450
View JSON Data
[{"item_id":"aluminum_ore","quantity":102000},{"item_id":"carbon_ore","quantity":53100},{"item_id":"copper_ore","quantity":68350},{"item_id":"fluorine_gas","quantity":850},{"item_id":"gold_ore","quantity":1700},{"item_id":"helium_ice","quantity":4900},{"item_id":"iron_ore","quantity":160600},{"item_id":"nickel_ore","quantity":100300},{"item_id":"nitrogen_ice","quantity":9800},{"item_id":"silicon_ore","quantity":24450},{"item_id":"silver_ore","quantity":1700},{"item_id":"titanium_ore","quantity":6750},{"item_id":"tungsten_ore","quantity":91550},{"item_id":"water_ice","quantity":4900}]