Photon-Absorbing Plant

Heavy-duty production complex with substantial coolant infrastructure managing rapid krypton-polymer interactions. Reinforced reaction vessels and precision control nodes maintain the exact conditions needed for consistent particle generation and optical properties.
Level3
Build Cost890,000 cr
Build Time260s
Labor32
Power Draw4
Life Support Draw1
Metamaterial MixerStealth PowderWorksPhoton-AbsorbingPlantQuantum ObscurityForge
OutputSynthesize Cloaking Dust
Crafting Time3.38s
ItemQuantity
Flex Polymer2
Purified Krypton1
ItemQuantity
Cloaking Dust3
MaterialQuantity
Steel Plate2400
Copper Piping1200
Reinforced Frame850
Control Node400
Coolant Loop650
View JSON Data
[{"item_id":"aluminum_ore","quantity":29700},{"item_id":"carbon_ore","quantity":15300},{"item_id":"copper_ore","quantity":21250},{"item_id":"fluorine_gas","quantity":400},{"item_id":"gold_ore","quantity":800},{"item_id":"helium_ice","quantity":1300},{"item_id":"iron_ore","quantity":49150},{"item_id":"nickel_ore","quantity":28900},{"item_id":"nitrogen_ice","quantity":2600},{"item_id":"silicon_ore","quantity":7200},{"item_id":"silver_ore","quantity":800},{"item_id":"titanium_ore","quantity":2100},{"item_id":"tungsten_ore","quantity":28050},{"item_id":"water_ice","quantity":1300}]