Null Matrix Production Facility

An expanded plant with dedicated lattice-weaving stations and null-matter integration zones. Each matrix is assembled in stages, with processing cores calibrated to synchronize the layers of null matter before final encapsulation in reinforced bulkheads.
Level2
Build Cost1,904,000 cr
Build Time250s
Labor80
Power Draw2
Life Support Draw1
Null MatrixAssembly LineNull MatrixProductionFacilityAutomated NullMatrix WorksNull MatrixFabricationComplex
OutputBuild Voidborn Null Matrix
Crafting Time93s
ItemQuantity
Processed Null Matter5
Processing Core1
Shield Matrix1
ItemQuantity
Voidborn Null Matrix1
MaterialQuantity
Steel Plate3850
Copper Piping1700
Structural Frame1200
Control Node450
Hull Plating1300
Reinforced Bulkhead950
View JSON Data
[{"item_id":"aluminum_ore","quantity":102300},{"item_id":"copper_ore","quantity":14100},{"item_id":"fluorine_gas","quantity":450},{"item_id":"gold_ore","quantity":900},{"item_id":"iron_ore","quantity":65250},{"item_id":"nickel_ore","quantity":2400},{"item_id":"silicon_ore","quantity":5250},{"item_id":"silver_ore","quantity":900},{"item_id":"titanium_ore","quantity":17900},{"item_id":"tungsten_ore","quantity":42500}]