Nuclear Module Fabrication Bay

Expanded facility with dedicated fuel-assembly staging, automated lead-shielding welding, and integrated radiation-hardened circuit insertion. Structural frames provide containment during assembly while control nodes coordinate multi-stage fuel and shielding integration.
Level2
Build Cost3,937,000 cr
Build Time390s
Labor42
Power Draw2
Life Support Draw1
Reactor ModuleAssembly CellNuclear ModuleFabrication BayReactor AssemblyPlantAdvanced ReactorModule Complex
OutputBuild Nuclear Reactor I
Crafting Time195s
ItemQuantity
Lead Sheet10
Radiation-Hardened Circuit4
Reactor Fuel Assembly1
Superconductor2
Titanium Alloy4
ItemQuantity
Nuclear Reactor I1
MaterialQuantity
Steel Plate15050
Copper Piping8750
Structural Frame6200
Control Node2100
Lead Shielding10350
Radiation-Hardened Circuit3900
View JSON Data
[{"item_id":"aluminum_ore","quantity":43000},{"item_id":"copper_ore","quantity":71850},{"item_id":"fluorine_gas","quantity":6000},{"item_id":"gold_ore","quantity":4200},{"item_id":"iron_ore","quantity":127550},{"item_id":"lead_ore","quantity":82800},{"item_id":"nickel_ore","quantity":12400},{"item_id":"radium_ore","quantity":7800},{"item_id":"silicon_ore","quantity":30800},{"item_id":"silver_ore","quantity":4200},{"item_id":"titanium_ore","quantity":6000},{"item_id":"tungsten_ore","quantity":77350}]