Nuclear Assembly Plant

Dedicated fusion-fuel facility with dual-stage heating and plasma injection for precise isotope combination. Structural reinforcement supports the cryogenic systems needed to handle liquid tritium at production scale.
Level2
Build Cost750,000 cr
Build Time170s
Labor16
Power Draw2
Life Support Draw1
Fuel Rod CasterNuclear AssemblyPlantFusion FuelRefineryStellar Fuel Nexus
OutputFabricate Fusion Fuel Rod
Crafting Time37.5s
ItemQuantity
Liquid Tritium2
Thorium Fuel Rod1
ItemQuantity
Fusion Fuel Rod1
MaterialQuantity
Steel Plate2150
Copper Piping1100
Structural Frame950
Control Node300
Heat Sink900
Plasma Injector300
View JSON Data
[{"item_id":"aluminum_ore","quantity":20650},{"item_id":"copper_ore","quantity":17400},{"item_id":"fluorine_gas","quantity":300},{"item_id":"gold_ore","quantity":600},{"item_id":"iridium_ore","quantity":300},{"item_id":"iron_ore","quantity":18200},{"item_id":"nickel_ore","quantity":1900},{"item_id":"palladium_ore","quantity":600},{"item_id":"plasma_residue","quantity":600},{"item_id":"silicon_ore","quantity":5300},{"item_id":"silver_ore","quantity":3000},{"item_id":"titanium_ore","quantity":1500},{"item_id":"tungsten_ore","quantity":11650}]