Nickel Flash Furnace

A heavy flash-smelting installation with reinforced framing and extensive coolant loops, oxidizing ore concentrate in suspension to pour billets at industrial pace while sustained plasma injection keeps the reaction self-feeding.
Level3
Build Cost1,049,000 cr
Build Time190s
Labor21
Power Draw4
Life Support Draw1
Nickel SmelterNickel RefineryNickel FlashFurnaceCarbonyl NickelWorks
OutputSmelt Nickel Billet
Crafting Time2.7s
ItemQuantity
Nickel Ore10
ItemQuantity
Nickel Billet1
MaterialQuantity
Steel Plate1250
Copper Piping650
Reinforced Frame450
Control Node200
Heat Sink900
Plasma Injector300
Coolant Loop650
View JSON Data
[{"item_id":"aluminum_ore","quantity":31000},{"item_id":"carbon_ore","quantity":8100},{"item_id":"copper_ore","quantity":21200},{"item_id":"fluorine_gas","quantity":200},{"item_id":"gold_ore","quantity":400},{"item_id":"helium_ice","quantity":1300},{"item_id":"iridium_ore","quantity":300},{"item_id":"iron_ore","quantity":29900},{"item_id":"nickel_ore","quantity":15300},{"item_id":"nitrogen_ice","quantity":2600},{"item_id":"palladium_ore","quantity":600},{"item_id":"plasma_residue","quantity":600},{"item_id":"silicon_ore","quantity":5000},{"item_id":"silver_ore","quantity":2800},{"item_id":"titanium_ore","quantity":2300},{"item_id":"tungsten_ore","quantity":18150},{"item_id":"water_ice","quantity":1300}]