Multi-Beam Mining Station

Large-scale production plant with dedicated laser-optics benches, barrel-assembly stations, and structural-frame mounting systems working in coordinated sequence to produce hyper-mining lasers.
Level2
Build Cost4,617,000 cr
Build Time270s
Labor26
Power Draw2
Life Support Draw1
Mining LaserAssembly LineMulti-Beam MiningStationIndustrialExtractionPlatformHyperdensityExtraction Complex
OutputBuild Hyper Mining Laser III
Crafting Time495s
ItemQuantity
Focused Crystal6
Laser Focus Array4
Power Core2
Titanium Ingot5
ItemQuantity
Hyper Mining Laser III1
MaterialQuantity
Steel Plate20300
Copper Piping11400
Structural Frame8100
Control Node2800
Weapon Housing9200
Barrel Assembly5100
Base MaterialQuantity
Aluminum Ore297500
Copper Ore149200
Fluorine Gas2800
Gold Ore5600
Iron Ore187900
Nickel Ore16200
Silicon Ore35200
Silver Ore5600
Titanium Ore26300
Tungsten Ore142300
View JSON Data
[{"item_id":"aluminum_ore","quantity":297500},{"item_id":"copper_ore","quantity":149200},{"item_id":"fluorine_gas","quantity":2800},{"item_id":"gold_ore","quantity":5600},{"item_id":"iron_ore","quantity":187900},{"item_id":"nickel_ore","quantity":16200},{"item_id":"silicon_ore","quantity":35200},{"item_id":"silver_ore","quantity":5600},{"item_id":"titanium_ore","quantity":26300},{"item_id":"tungsten_ore","quantity":142300}]