Mass Driver Workshop

Dedicated facility with dedicated welding bays for darksteel, superconductor winding stations, and integrated barrel-bore finishing. Structural frames distribute the enormous stresses from the railgun capacitors and adamantite components.
Level2
Build Cost3,703,000 cr
Build Time250s
Labor22
Power Draw2
Life Support Draw1
Heavy RailgunAssembly FacilityMass DriverWorkshopMass Driver ForgeMass DriverFoundry
OutputBuild Mass Driver
Crafting Time180s
ItemQuantity
Adamantite Bar2
Darksteel Plating4
Railgun Capacitor3
Superconductor5
Weapon Housing1
ItemQuantity
Mass Driver1
MaterialQuantity
Steel Plate15950
Copper Piping8350
Structural Frame6900
Control Node1950
Weapon Housing6750
Barrel Assembly4100
Base MaterialQuantity
Aluminum Ore225000
Copper Ore114750
Fluorine Gas1950
Gold Ore3900
Iron Ore150500
Nickel Ore13800
Silicon Ore29550
Silver Ore3900
Titanium Ore19550
Tungsten Ore113950
View JSON Data
[{"item_id":"aluminum_ore","quantity":225000},{"item_id":"copper_ore","quantity":114750},{"item_id":"fluorine_gas","quantity":1950},{"item_id":"gold_ore","quantity":3900},{"item_id":"iron_ore","quantity":150500},{"item_id":"nickel_ore","quantity":13800},{"item_id":"silicon_ore","quantity":29550},{"item_id":"silver_ore","quantity":3900},{"item_id":"titanium_ore","quantity":19550},{"item_id":"tungsten_ore","quantity":113950}]