Heavy Railgun Assembly Facility
Specialized heavy-weapons production line where darksteel plating is shaped, superconductor coils are wound and tested, and barrel assemblies are precisely aligned. Each mass driver takes 30 minutes of careful assembly and calibration.
Stats
| Level | 1 |
| Build Cost | 1,226,000 cr |
| Build Time | 170s |
| Labor | 11 |
| Power Draw | 1 |
| Life Support Draw | 1 |
Upgrade Path
Recipe
| Output | Build Mass Driver |
| Crafting Time | 180s |
Recipe Inputs
| Item | Quantity |
|---|---|
| Adamantite Bar | 2 |
| Darksteel Plating | 4 |
| Railgun Capacitor | 3 |
| Superconductor | 5 |
| Weapon Housing | 1 |
Recipe Outputs
| Item | Quantity |
|---|---|
| Mass Driver | 1 |
Build Materials
| Material | Quantity |
|---|---|
| Steel Plate | 12750 |
| Copper Piping | 5450 |
| Control Node | 1250 |
| Weapon Housing | 2900 |
| Barrel Assembly | 1350 |
Construction
| Base Material | Quantity |
|---|---|
| Aluminum Ore | 80200 |
| Copper Ore | 38750 |
| Fluorine Gas | 1250 |
| Gold Ore | 2500 |
| Iron Ore | 47850 |
| Silicon Ore | 1250 |
| Silver Ore | 2500 |
| Titanium Ore | 8400 |
| Tungsten Ore | 36050 |
View JSON Data
[{"item_id":"aluminum_ore","quantity":80200},{"item_id":"copper_ore","quantity":38750},{"item_id":"fluorine_gas","quantity":1250},{"item_id":"gold_ore","quantity":2500},{"item_id":"iron_ore","quantity":47850},{"item_id":"silicon_ore","quantity":1250},{"item_id":"silver_ore","quantity":2500},{"item_id":"titanium_ore","quantity":8400},{"item_id":"tungsten_ore","quantity":36050}]