Integrated Atmospheric Works

State-of-the-art facility with dual coolant loops and extensive reinforced framing for maximum cryogenic stability. Simultaneous multi-stage assembly of recyclers, environmental controls, and noble gas integration at peak efficiency.
Level4
Build Cost3,187,000 cr
Build Time420s
Labor35
Power Draw6
Life Support Draw1
AtmosphericAssembly LinePressurizationPlantAtmosphericProduction ComplexIntegratedAtmospheric Works
OutputAssemble Atmospheric Unit
Crafting Time9.9s
ItemQuantity
Air Recycler1
Environmental Control Unit1
Ionized Neon2
Purified Argon2
ItemQuantity
Atmospheric Unit2
MaterialQuantity
Steel Plate5000
Copper Piping2850
Reinforced Frame2750
Control Node1000
Coolant Loop2100
View JSON Data
[{"item_id":"aluminum_ore","quantity":95500},{"item_id":"carbon_ore","quantity":49500},{"item_id":"copper_ore","quantity":64450},{"item_id":"fluorine_gas","quantity":1000},{"item_id":"gold_ore","quantity":2000},{"item_id":"helium_ice","quantity":4200},{"item_id":"iron_ore","quantity":152150},{"item_id":"nickel_ore","quantity":93500},{"item_id":"nitrogen_ice","quantity":8400},{"item_id":"silicon_ore","quantity":23000},{"item_id":"silver_ore","quantity":2000},{"item_id":"titanium_ore","quantity":6500},{"item_id":"tungsten_ore","quantity":86650},{"item_id":"water_ice","quantity":4200}]