Industrial Fuel Storage System

Large-scale operation with extensive coolant circulation and plasma-assisted fabrication for consistent, high-pressure tank construction. Reinforced framing supports continuous production.
Level3
Build Cost1,165,000 cr
Build Time220s
Labor25
Power Draw4
Life Support Draw1
Steel PressureVesselReinforcedPressure TankIndustrial FuelStorage SystemQuantumContainment FuelReserve
OutputBuild Fuel Tank
Crafting Time3.9s
ItemQuantity
Liquid Hydrogen4
Steel Plate3
Titanium Alloy1
ItemQuantity
Fuel Tank1
MaterialQuantity
Steel Plate1150
Copper Piping650
Reinforced Frame400
Control Node200
Heat Sink1000
Plasma Injector350
Coolant Loop700
View JSON Data
[{"item_id":"aluminum_ore","quantity":31400},{"item_id":"carbon_ore","quantity":7200},{"item_id":"copper_ore","quantity":21950},{"item_id":"fluorine_gas","quantity":200},{"item_id":"gold_ore","quantity":400},{"item_id":"helium_ice","quantity":1400},{"item_id":"iridium_ore","quantity":350},{"item_id":"iron_ore","quantity":27850},{"item_id":"nickel_ore","quantity":13600},{"item_id":"nitrogen_ice","quantity":2800},{"item_id":"palladium_ore","quantity":700},{"item_id":"plasma_residue","quantity":700},{"item_id":"silicon_ore","quantity":4800},{"item_id":"silver_ore","quantity":3200},{"item_id":"titanium_ore","quantity":2400},{"item_id":"tungsten_ore","quantity":17200},{"item_id":"water_ice","quantity":1400}]