Industrial Fermentation Complex

Large-scale fermentation facility with multiple vat sections, integrated life support systems, and reinforced construction to handle continuous high-volume production. Advanced atmospheric management maintains ideal fermentation conditions.
Level3
Build Cost964,000 cr
Build Time330s
Labor28
Power Draw4
Life Support Draw1
Fermentation VatFermentationComplexIndustrialFermentationComplexAutomatedFermentation Plant
OutputCulture Fermentation Vat
Crafting Time1.35s
ItemQuantity
Fermentation Culture3
MaterialQuantity
Steel Plate1450
Copper Piping700
Reinforced Frame500
Control Node250
Atmospheric Unit1150
Air Recycler650
Life Support Unit400
View JSON Data
[{"item_id":"aluminum_ore","quantity":19900},{"item_id":"argon_gas","quantity":12100},{"item_id":"carbon_ore","quantity":9000},{"item_id":"copper_ore","quantity":16450},{"item_id":"fluorine_gas","quantity":1450},{"item_id":"gold_ore","quantity":500},{"item_id":"iron_ore","quantity":36550},{"item_id":"neon_gas","quantity":7200},{"item_id":"nickel_ore","quantity":23500},{"item_id":"platinum_ore","quantity":6500},{"item_id":"silicon_ore","quantity":11950},{"item_id":"silver_ore","quantity":500},{"item_id":"titanium_ore","quantity":2450},{"item_id":"tungsten_ore","quantity":22150},{"item_id":"water_ice","quantity":3550}]