High-Velocity Assembly Works

A larger facility handling increased durasteel volumes and dual-capacitor synchronization across parallel assembly lines. Structural frames support simultaneous targeting-computer calibration and electromagnetic coil testing.
Level2
Build Cost3,350,000 cr
Build Time260s
Labor24
Power Draw2
Life Support Draw1
Enhanced DriverWorkshopHigh-VelocityAssembly WorksPrecisionAcceleratorFoundryExtreme VelocityArsenal
OutputBuild Piercing Railgun II
Crafting Time225s
ItemQuantity
Durasteel Plate5
Power Core1
Railgun Capacitor2
Superconductor3
ItemQuantity
Piercing Railgun II1
MaterialQuantity
Steel Plate22550
Copper Piping10050
Structural Frame7700
Control Node2700
Weapon Housing7250
Barrel Assembly5550
Base MaterialQuantity
Aluminum Ore251200
Copper Ore130650
Fluorine Gas2700
Gold Ore5400
Iron Ore180500
Nickel Ore15400
Silicon Ore33500
Silver Ore5400
Titanium Ore22750
Tungsten Ore140400
View JSON Data
[{"item_id":"aluminum_ore","quantity":251200},{"item_id":"copper_ore","quantity":130650},{"item_id":"fluorine_gas","quantity":2700},{"item_id":"gold_ore","quantity":5400},{"item_id":"iron_ore","quantity":180500},{"item_id":"nickel_ore","quantity":15400},{"item_id":"silicon_ore","quantity":33500},{"item_id":"silver_ore","quantity":5400},{"item_id":"titanium_ore","quantity":22750},{"item_id":"tungsten_ore","quantity":140400}]