High-Capacity Coolant Refinery

Industrial-scale production with extensive heat sink arrays and cryogenic containment. Reinforced pressure vessels handle the intense thermal cycling while automated plasma injectors precisely regulate nitrogen addition rates for consistent fluid synthesis.
Level3
Build Cost958,000 cr
Build Time330s
Labor18
Power Draw4
Life Support Draw1
Coolant BlendingLineCryogenic CoolantPlantHigh-CapacityCoolant RefineryAutomatedCryogenicSynthesis Complex
OutputSynthesize Coolant Fluid
Crafting Time2.02s
ItemQuantity
Liquid Nitrogen3
Purified Water2
ItemQuantity
Coolant Fluid3
MaterialQuantity
Steel Plate1250
Copper Piping600
Reinforced Frame400
Control Node200
Heat Sink950
Plasma Injector300
Coolant Loop600
View JSON Data
[{"item_id":"aluminum_ore","quantity":29750},{"item_id":"carbon_ore","quantity":7200},{"item_id":"copper_ore","quantity":20300},{"item_id":"fluorine_gas","quantity":200},{"item_id":"gold_ore","quantity":400},{"item_id":"helium_ice","quantity":1200},{"item_id":"iridium_ore","quantity":300},{"item_id":"iron_ore","quantity":27400},{"item_id":"nickel_ore","quantity":13600},{"item_id":"nitrogen_ice","quantity":2400},{"item_id":"palladium_ore","quantity":600},{"item_id":"plasma_residue","quantity":600},{"item_id":"silicon_ore","quantity":4600},{"item_id":"silver_ore","quantity":2800},{"item_id":"titanium_ore","quantity":2200},{"item_id":"tungsten_ore","quantity":16750},{"item_id":"water_ice","quantity":1200}]