Chaff Assembly Line

An expanded facility with multiple cutting heads and automated bundling stations. Coolant loops keep cutting tools efficient during continuous operation, while structural frames provide rigidity for high-speed processing.
Level2
Build Cost279,000 cr
Build Time140s
Labor12
Power Draw2
Life Support Draw1
CountermeasureFabricatorChaff AssemblyLineEvasionCountermeasurePlantApex DeceptionFabricator
OutputBuild Chaff Pod
Crafting Time1.35s
ItemQuantity
Flex Polymer2
Steel Plate1
ItemQuantity
Chaff Bundle10
MaterialQuantity
Steel Plate2300
Copper Piping1300
Structural Frame950
Control Node300
Coolant Loop300
View JSON Data
[{"item_id":"aluminum_ore","quantity":5350},{"item_id":"copper_ore","quantity":13500},{"item_id":"fluorine_gas","quantity":300},{"item_id":"gold_ore","quantity":600},{"item_id":"helium_ice","quantity":600},{"item_id":"iron_ore","quantity":16600},{"item_id":"nickel_ore","quantity":1900},{"item_id":"nitrogen_ice","quantity":1200},{"item_id":"silicon_ore","quantity":4100},{"item_id":"silver_ore","quantity":600},{"item_id":"titanium_ore","quantity":300},{"item_id":"tungsten_ore","quantity":10500},{"item_id":"water_ice","quantity":600}]