Capital Laser Manufacturing Plant

An expanded facility with dedicated integration stations for laser focus arrays and crystalline-lattice mounting. Structural frames and advanced control systems enable efficient assembly of capital-grade mining systems.
Level2
Build Cost3,598,000 cr
Build Time250s
Labor80
Power Draw2
Life Support Draw1
Capital LaserAssembly LineCapital LaserManufacturingPlantCapital-GradeLaser ProductionWorksCapital LaserProduction System
OutputBuild Mining Laser IV
Crafting Time375s
ItemQuantity
Crystalline Lattice2
Focused Crystal2
Laser Focus Array1
Mining Laser III1
Power Cell2
ItemQuantity
Mining Laser IV1
MaterialQuantity
Steel Plate20150
Copper Piping10200
Structural Frame8300
Control Node3000
Weapon Housing7950
Barrel Assembly5250
Base MaterialQuantity
Aluminum Ore269800
Copper Ore140100
Fluorine Gas3000
Gold Ore6000
Iron Ore184050
Nickel Ore16600
Silicon Ore36200
Silver Ore6000
Titanium Ore24150
Tungsten Ore141050
View JSON Data
[{"item_id":"aluminum_ore","quantity":269800},{"item_id":"copper_ore","quantity":140100},{"item_id":"fluorine_gas","quantity":3000},{"item_id":"gold_ore","quantity":6000},{"item_id":"iron_ore","quantity":184050},{"item_id":"nickel_ore","quantity":16600},{"item_id":"silicon_ore","quantity":36200},{"item_id":"silver_ore","quantity":6000},{"item_id":"titanium_ore","quantity":24150},{"item_id":"tungsten_ore","quantity":141050}]