Beacon Fabrication Plant

A larger facility with dedicated superconductor integration and power-cell charging stations, running coolant loops to manage thermal load from precision electronics. Output triples compared to the assembly line.
Level2
Build Cost430,000 cr
Build Time240s
Labor22
Power Draw2
Life Support Draw1
Navigation BeaconAssemblyBeacon FabricationPlantWarp BeaconFoundryQuantum BeaconForge
OutputBuild Anchor Beacon
Crafting Time42s
ItemQuantity
Circuit Board4
Power Cell2
Superconductor2
ItemQuantity
Anchor Beacon2
MaterialQuantity
Steel Plate2650
Copper Piping1450
Structural Frame1150
Control Node350
Coolant Loop350
View JSON Data
[{"item_id":"aluminum_ore","quantity":6450},{"item_id":"copper_ore","quantity":15800},{"item_id":"fluorine_gas","quantity":350},{"item_id":"gold_ore","quantity":700},{"item_id":"helium_ice","quantity":700},{"item_id":"iron_ore","quantity":19650},{"item_id":"nickel_ore","quantity":2300},{"item_id":"nitrogen_ice","quantity":1400},{"item_id":"silicon_ore","quantity":4950},{"item_id":"silver_ore","quantity":700},{"item_id":"titanium_ore","quantity":350},{"item_id":"tungsten_ore","quantity":12400},{"item_id":"water_ice","quantity":700}]