Autopilot Assembly Plant

Expanded facility with structural framing that doubles throughput by running multiple assembly chains in parallel. Each station handles a distinct phase of module integration and validation.
Level2
Build Cost506,000 cr
Build Time180s
Labor18
Power Draw2
Life Support Draw1
Flight ControlAssembly LineAutopilot AssemblyPlantAutopilotManufacturingFacilityAutopilotManufacturing Hub
OutputBuild Basic Autopilot
Crafting Time30s
ItemQuantity
Circuit Board3
Processing Core1
ItemQuantity
Autopilot Module1
MaterialQuantity
Steel Plate1300
Copper Piping650
Structural Frame450
Control Node150
Processing Core300
Sensor Array300
View JSON Data
[{"item_id":"aluminum_ore","quantity":5850},{"item_id":"copper_ore","quantity":5850},{"item_id":"energy_crystal","quantity":600},{"item_id":"fluorine_gas","quantity":1950},{"item_id":"gold_ore","quantity":300},{"item_id":"iron_ore","quantity":9700},{"item_id":"krypton_gas","quantity":600},{"item_id":"neon_gas","quantity":600},{"item_id":"nickel_ore","quantity":900},{"item_id":"palladium_ore","quantity":300},{"item_id":"platinum_ore","quantity":600},{"item_id":"silicon_ore","quantity":4650},{"item_id":"silver_ore","quantity":300},{"item_id":"titanium_ore","quantity":1950},{"item_id":"tungsten_ore","quantity":6600}]