Assembly Bay for Compact Copper Wiring Plant

Copper wiring plants are assembled by hand here, processing cores threaded into the drawing dies and control nodes set to govern the anneal each module runs between passes.
Level1
Build Cost586,267 cr
Build Time150s
Labor10
Power Draw1
Life Support Draw1
Assembly Bay forCompact CopperWiring PlantFabrication Linefor Compact CopperWiring PlantIntegration Worksfor Compact CopperWiring PlantOutfittingManufactory forCompact CopperWiring Plant
OutputBuild Compact Copper Wiring Plant
Crafting Time675s
ItemQuantity
Processing Core1
Coolant Loop1
Circuit Board2
Durasteel Plate3
Superconductor1
ItemQuantity
compact_copper_wiring_plant1
MaterialQuantity
Steel Plate3300
Copper Piping1200
Control Node340
Processing Core300
Sensor Array300
View JSON Data
[{"item_id":"aluminum_ore","quantity":3980},{"item_id":"copper_ore","quantity":5560},{"item_id":"energy_crystal","quantity":600},{"item_id":"fluorine_gas","quantity":2140},{"item_id":"gold_ore","quantity":680},{"item_id":"iron_ore","quantity":9940},{"item_id":"krypton_gas","quantity":600},{"item_id":"neon_gas","quantity":600},{"item_id":"palladium_ore","quantity":300},{"item_id":"platinum_ore","quantity":600},{"item_id":"silicon_ore","quantity":3040},{"item_id":"silver_ore","quantity":680},{"item_id":"titanium_ore","quantity":2140},{"item_id":"tungsten_ore","quantity":6640}]