Aerogel Production Plant

Upgraded facility with enhanced thermal and pressure controls, accelerating the delicate spinning process through advanced plasma and heat-sink regulation.
Level2
Build Cost365,000 cr
Build Time250s
Labor10
Power Draw2
Life Support Draw1
Aerogel SpinningStationAerogel ProductionPlantHigh-CapacityAerogel MillAerogelManufacturing Hub
OutputSpin Metallic Aerogel
Crafting Time3.75s
ItemQuantity
Aluminum Sheet4
Graphene Sheet2
Silicate Composite1
ItemQuantity
Metallic Aerogel1
MaterialQuantity
Steel Plate1100
Copper Piping600
Structural Frame400
Control Node150
Heat Sink400
Plasma Injector150
View JSON Data
[{"item_id":"aluminum_ore","quantity":9500},{"item_id":"copper_ore","quantity":8100},{"item_id":"fluorine_gas","quantity":150},{"item_id":"gold_ore","quantity":300},{"item_id":"iridium_ore","quantity":150},{"item_id":"iron_ore","quantity":8350},{"item_id":"nickel_ore","quantity":800},{"item_id":"palladium_ore","quantity":300},{"item_id":"plasma_residue","quantity":300},{"item_id":"silicon_ore","quantity":2350},{"item_id":"silver_ore","quantity":1500},{"item_id":"titanium_ore","quantity":750},{"item_id":"tungsten_ore","quantity":5350}]