Aerogel Manufacturing Hub

Cutting-edge automated facility with full redundancy, cryogenic precision, and integrated quality monitoring—producing aerogel at near-continuous rates.
Level4
Build Cost3,355,000 cr
Build Time420s
Labor25
Power Draw6
Life Support Draw1
Aerogel SpinningStationAerogel ProductionPlantHigh-CapacityAerogel MillAerogelManufacturing Hub
OutputSpin Metallic Aerogel
Crafting Time3.75s
ItemQuantity
Aluminum Sheet4
Graphene Sheet2
Silicate Composite1
ItemQuantity
Metallic Aerogel1
MaterialQuantity
Steel Plate1950
Copper Piping1250
Reinforced Frame1150
Control Node400
Heat Sink3250
Plasma Injector1100
Coolant Loop1850
View JSON Data
[{"item_id":"aluminum_ore","quantity":95550},{"item_id":"carbon_ore","quantity":20700},{"item_id":"copper_ore","quantity":61900},{"item_id":"fluorine_gas","quantity":400},{"item_id":"gold_ore","quantity":800},{"item_id":"helium_ice","quantity":3700},{"item_id":"iridium_ore","quantity":1100},{"item_id":"iron_ore","quantity":77200},{"item_id":"nickel_ore","quantity":39100},{"item_id":"nitrogen_ice","quantity":7400},{"item_id":"palladium_ore","quantity":2200},{"item_id":"plasma_residue","quantity":2200},{"item_id":"silicon_ore","quantity":14000},{"item_id":"silver_ore","quantity":9600},{"item_id":"titanium_ore","quantity":7100},{"item_id":"tungsten_ore","quantity":47750},{"item_id":"water_ice","quantity":3700}]