Advanced Cryogenic Works

Cutting-edge facility with extensive reinforced construction supporting maximum-pressure helium-3 and liquid nitrogen blending. Simultaneous multi-stream copper piping integration and thermal-seal verification at peak efficiency for mission-critical cooling systems.
Level4
Build Cost3,109,000 cr
Build Time420s
Labor35
Power Draw6
Life Support Draw1
Coolant LoopAssembly LineCryogenicProduction PlantCoolantManufacturingComplexAdvanced CryogenicWorks
OutputAssemble Coolant Loop
Crafting Time9.9s
ItemQuantity
Coolant Fluid2
Copper Piping6
Helium-32
Liquid Nitrogen2
ItemQuantity
Coolant Loop2
MaterialQuantity
Steel Plate4700
Copper Piping2850
Reinforced Frame2550
Control Node950
Coolant Loop2150
View JSON Data
[{"item_id":"aluminum_ore","quantity":88600},{"item_id":"carbon_ore","quantity":45900},{"item_id":"copper_ore","quantity":62300},{"item_id":"fluorine_gas","quantity":950},{"item_id":"gold_ore","quantity":1900},{"item_id":"helium_ice","quantity":4300},{"item_id":"iron_ore","quantity":142050},{"item_id":"nickel_ore","quantity":86700},{"item_id":"nitrogen_ice","quantity":8600},{"item_id":"silicon_ore","quantity":21350},{"item_id":"silver_ore","quantity":1900},{"item_id":"titanium_ore","quantity":6050},{"item_id":"tungsten_ore","quantity":81250},{"item_id":"water_ice","quantity":4300}]