Wire Spinner
A dedicated production line that processes raw copper ore into bundled wiring through controlled heating and extrusion. Steady output suitable for modest station demand.
Stats
| Level | 1 |
| Build Cost | 106,000 cr |
| Build Time | 90s |
| Labor | 6 |
| Power Draw | 1 |
| Life Support Draw | 1 |
Upgrade Path
Recipe
| Output | Basic Copper Processing |
| Crafting Time | 0.32s |
Recipe Inputs
| Item | Quantity |
|---|---|
| Copper Ore | 8 |
Recipe Outputs
| Item | Quantity |
|---|---|
| Copper Wiring | 1 |
Build Materials
| Material | Quantity |
|---|---|
| Steel Plate | 2750 |
| Copper Piping | 1050 |
| Control Node | 300 |
Construction
| Base Material | Quantity |
|---|---|
| Aluminum Ore | 600 |
| Copper Ore | 4350 |
| Fluorine Gas | 300 |
| Gold Ore | 600 |
| Iron Ore | 6850 |
| Silicon Ore | 300 |
| Silver Ore | 600 |
| Titanium Ore | 300 |
| Tungsten Ore | 4100 |
View JSON Data
[{"item_id":"aluminum_ore","quantity":600},{"item_id":"copper_ore","quantity":4350},{"item_id":"fluorine_gas","quantity":300},{"item_id":"gold_ore","quantity":600},{"item_id":"iron_ore","quantity":6850},{"item_id":"silicon_ore","quantity":300},{"item_id":"silver_ore","quantity":600},{"item_id":"titanium_ore","quantity":300},{"item_id":"tungsten_ore","quantity":4100}]