Torpedo Manufacturing Plant

Integrated weapons assembly system with dedicated weapon housings and barrel assemblies, nearly tripling output speed compared to basic lines. Structural reinforcement and control systems ensure warhead stability during assembly.
Level2
Build Cost328,000 cr
Build Time250s
Labor16
Power Draw2
Life Support Draw1
TorpedoFabrication LineTorpedoManufacturingPlantIndustrial TorpedoProduction FactoryQuantum TorpedoManufacturingComplex
OutputAssemble Standard Torpedoes
Crafting Time12.38s
ItemQuantity
Circuit Board1
Durasteel Plate2
Warhead Assembly1
ItemQuantity
Standard Torpedoes3
MaterialQuantity
Steel Plate1600
Copper Piping850
Structural Frame600
Control Node200
Weapon Housing600
Barrel Assembly450
View JSON Data
[{"item_id":"aluminum_ore","quantity":20500},{"item_id":"copper_ore","quantity":10550},{"item_id":"fluorine_gas","quantity":200},{"item_id":"gold_ore","quantity":400},{"item_id":"iron_ore","quantity":14000},{"item_id":"nickel_ore","quantity":1200},{"item_id":"silicon_ore","quantity":2600},{"item_id":"silver_ore","quantity":400},{"item_id":"titanium_ore","quantity":1850},{"item_id":"tungsten_ore","quantity":11050}]