Thorium Fuel Works

A heavily fortified facility with extensive lead shielding, hazmat containers for waste containment, and automated fuel-rod forming that processes thorium at industrial scale with minimal losses.
Level3
Build Cost1,336,000 cr
Build Time400s
Labor50
Power Draw4
Life Support Draw1
Thorium RodFoundryFuel Rod CastingFacilityThorium Fuel WorksAdvanced ThoriumFuel Complex
OutputFabricate Thorium Fuel Rod
Crafting Time22.5s
ItemQuantity
Processed Thorium2
ItemQuantity
Thorium Fuel Rod1
MaterialQuantity
Steel Plate2000
Copper Piping1000
Reinforced Frame700
Control Node300
Lead Shielding2400
Radiation-Hardened Circuit950
Hazmat Container450
View JSON Data
[{"item_id":"aluminum_ore","quantity":37100},{"item_id":"carbon_ore","quantity":12600},{"item_id":"copper_ore","quantity":12600},{"item_id":"fluorine_gas","quantity":1250},{"item_id":"gold_ore","quantity":600},{"item_id":"iron_ore","quantity":51850},{"item_id":"lead_ore","quantity":24600},{"item_id":"nickel_ore","quantity":23800},{"item_id":"radium_ore","quantity":1900},{"item_id":"silicon_ore","quantity":6850},{"item_id":"silver_ore","quantity":600},{"item_id":"titanium_ore","quantity":3550},{"item_id":"tungsten_ore","quantity":28450}]