Thermal Separation Plant
An efficient purification facility with enhanced heat sinks and plasma injection for faster ice melting and contaminant removal. Modular filtration stages ensure consistent water quality for both life support and chemical lines.
Stats
| Level | 2 |
| Build Cost | 309,000 cr |
| Build Time | 140s |
| Labor | 12 |
| Power Draw | 2 |
| Life Support Draw | 1 |
Upgrade Path
Recipe
| Output | Process Water Ice |
| Crafting Time | 1.08s |
Recipe Inputs
| Item | Quantity |
|---|---|
| Water Ice | 5 |
Recipe Outputs
| Item | Quantity |
|---|---|
| Purified Water | 3 |
Build Materials
| Material | Quantity |
|---|---|
| Steel Plate | 1100 |
| Copper Piping | 600 |
| Structural Frame | 500 |
| Control Node | 150 |
| Heat Sink | 400 |
| Plasma Injector | 150 |
Construction
| Base Material | Quantity |
|---|---|
| Aluminum Ore | 10000 |
| Copper Ore | 8700 |
| Fluorine Gas | 150 |
| Gold Ore | 300 |
| Iridium Ore | 150 |
| Iron Ore | 9350 |
| Nickel Ore | 1000 |
| Palladium Ore | 300 |
| Plasma Residue | 300 |
| Silicon Ore | 2750 |
| Silver Ore | 1500 |
| Titanium Ore | 750 |
| Tungsten Ore | 5950 |
View JSON Data
[{"item_id":"aluminum_ore","quantity":10000},{"item_id":"copper_ore","quantity":8700},{"item_id":"fluorine_gas","quantity":150},{"item_id":"gold_ore","quantity":300},{"item_id":"iridium_ore","quantity":150},{"item_id":"iron_ore","quantity":9350},{"item_id":"nickel_ore","quantity":1000},{"item_id":"palladium_ore","quantity":300},{"item_id":"plasma_residue","quantity":300},{"item_id":"silicon_ore","quantity":2750},{"item_id":"silver_ore","quantity":1500},{"item_id":"titanium_ore","quantity":750},{"item_id":"tungsten_ore","quantity":5950}]