Thermal Fin Production Plant
Mid-scale facility with structural reinforcement supporting continuous fin extrusion and parallel casting beds. Expanded copper and aluminum handling allows multiple heat-sink profiles to run side by side.
Stats
| Level | 2 |
| Build Cost | 300,000 cr |
| Build Time | 250s |
| Labor | 14 |
| Power Draw | 2 |
| Life Support Draw | 1 |
Upgrade Path
Recipe
| Output | Heat Sink Casting |
| Crafting Time | 9.9s |
Recipe Inputs
| Item | Quantity |
|---|---|
| Aluminum Sheet | 6 |
| Copper Piping | 4 |
Recipe Outputs
| Item | Quantity |
|---|---|
| Heat Sink | 2 |
Build Materials
| Material | Quantity |
|---|---|
| Steel Plate | 2250 |
| Copper Piping | 1350 |
| Structural Frame | 850 |
| Control Node | 300 |
| Coolant Loop | 300 |
Construction
| Base Material | Quantity |
|---|---|
| Aluminum Ore | 4850 |
| Copper Ore | 13050 |
| Fluorine Gas | 300 |
| Gold Ore | 600 |
| Helium Ice | 600 |
| Iron Ore | 15550 |
| Nickel Ore | 1700 |
| Nitrogen Ice | 1200 |
| Silicon Ore | 3700 |
| Silver Ore | 600 |
| Titanium Ore | 300 |
| Tungsten Ore | 9900 |
| Water Ice | 600 |
View JSON Data
[{"item_id":"aluminum_ore","quantity":4850},{"item_id":"copper_ore","quantity":13050},{"item_id":"fluorine_gas","quantity":300},{"item_id":"gold_ore","quantity":600},{"item_id":"helium_ice","quantity":600},{"item_id":"iron_ore","quantity":15550},{"item_id":"nickel_ore","quantity":1700},{"item_id":"nitrogen_ice","quantity":1200},{"item_id":"silicon_ore","quantity":3700},{"item_id":"silver_ore","quantity":600},{"item_id":"titanium_ore","quantity":300},{"item_id":"tungsten_ore","quantity":9900},{"item_id":"water_ice","quantity":600}]