Shield Hardening Production Line

An expanded facility with dedicated calibration stations and resonance-tuning chambers. Multiple assembly tracks operate in parallel, each equipped with null-matter processors that verify circuit coherence before final matrix encapsulation.
Level2
Build Cost2,407,000 cr
Build Time250s
Labor20
Power Draw2
Life Support Draw1
Shield ResonanceAssemblyShield HardeningProduction LineAutomated ShieldWorksShield HardenerFabrication Plant
OutputBuild Void Shield Hardener
Crafting Time123s
ItemQuantity
Circuit Board3
Processed Null Matter1
Shield Emitter1
Void Shield Matrix1
ItemQuantity
Void Shield Hardener1
MaterialQuantity
Steel Plate2700
Copper Piping1400
Structural Frame1050
Control Node300
Shield Emitter950
Shield Matrix650
View JSON Data
[{"item_id":"aluminum_ore","quantity":9650},{"item_id":"argon_gas","quantity":1300},{"item_id":"carbon_ore","quantity":7800},{"item_id":"copper_ore","quantity":11700},{"item_id":"energy_crystal","quantity":3800},{"item_id":"fluorine_gas","quantity":2200},{"item_id":"gold_ore","quantity":3200},{"item_id":"iridium_ore","quantity":1900},{"item_id":"iron_ore","quantity":19500},{"item_id":"nickel_ore","quantity":3400},{"item_id":"palladium_ore","quantity":4750},{"item_id":"silicon_ore","quantity":9000},{"item_id":"silver_ore","quantity":15800},{"item_id":"titanium_ore","quantity":2200},{"item_id":"tungsten_ore","quantity":12600}]