Quantum Processor Manufacturing Plant

Expanded facility with dedicated circuit board fabrication and processing core integration stations operating in parallel. Structural frames provide precision mounting; automated testing validates quantum coherence before final assembly.
Level2
Build Cost1,014,000 cr
Build Time250s
Labor68
Power Draw2
Life Support Draw1
Logic CoreAssembly LineQuantum ProcessorManufacturingPlantLogic MatrixProductionFacilityAutomated QuantumLogic Works
OutputBuild Solarian Logic Matrix
Crafting Time51s
ItemQuantity
Circuit Board5
Processing Core1
Solarian Composite1
ItemQuantity
Solarian Logic Matrix1
MaterialQuantity
Steel Plate1900
Copper Piping1050
Structural Frame650
Control Node250
Hull Plating700
Reinforced Bulkhead500
View JSON Data
[{"item_id":"aluminum_ore","quantity":54150},{"item_id":"copper_ore","quantity":8050},{"item_id":"fluorine_gas","quantity":250},{"item_id":"gold_ore","quantity":500},{"item_id":"iron_ore","quantity":34600},{"item_id":"nickel_ore","quantity":1300},{"item_id":"silicon_ore","quantity":2850},{"item_id":"silver_ore","quantity":500},{"item_id":"titanium_ore","quantity":9450},{"item_id":"tungsten_ore","quantity":22600}]