Neural EM Factory

Larger facility with dedicated weapon housing stations, barrel assembly integration, and structural reinforcement to handle the sensitive assembly of neural-interface gel into charge packs at higher volumes.
Level2
Build Cost461,000 cr
Build Time240s
Labor30
Power Draw2
Life Support Draw1
Neural EM PressNeural EM FactoryNeural EMManufactoryNeural EM OrdnanceComplex
OutputManufacture Neural EM Charges
Crafting Time54s
ItemQuantity
Circuit Board2
Neural Interface Gel1
Superconductor2
ItemQuantity
Neural Disruption Charge Pack3
MaterialQuantity
Steel Plate1800
Copper Piping750
Structural Frame650
Control Node200
Weapon Housing650
Barrel Assembly450
View JSON Data
[{"item_id":"aluminum_ore","quantity":21950},{"item_id":"copper_ore","quantity":10850},{"item_id":"fluorine_gas","quantity":200},{"item_id":"gold_ore","quantity":400},{"item_id":"iron_ore","quantity":15000},{"item_id":"nickel_ore","quantity":1300},{"item_id":"silicon_ore","quantity":2800},{"item_id":"silver_ore","quantity":400},{"item_id":"titanium_ore","quantity":1950},{"item_id":"tungsten_ore","quantity":11550}]