Integrated Cargo Plant

An expanded facility with dedicated stations for container integration, hull plating application, and reinforced bulkhead installation. Structural frames and additional control nodes enable faster throughput and improved volumetric optimization.
Level2
Build Cost343,000 cr
Build Time250s
Labor18
Power Draw2
Life Support Draw1
Modular AssemblyLineIntegrated CargoPlantAutomatedSuperstructureWorksHigh-CapacityCargo Fabrication
OutputBuild Cargo Superstructure
Crafting Time13.8s
ItemQuantity
Cargo Container2
Hull Plating1
Steel Plate10
ItemQuantity
Cargo Superstructure1
MaterialQuantity
Steel Plate750
Copper Piping350
Structural Frame300
Control Node100
Hull Plating250
Reinforced Bulkhead150
View JSON Data
[{"item_id":"aluminum_ore","quantity":17300},{"item_id":"copper_ore","quantity":3250},{"item_id":"fluorine_gas","quantity":100},{"item_id":"gold_ore","quantity":200},{"item_id":"iron_ore","quantity":12250},{"item_id":"nickel_ore","quantity":600},{"item_id":"silicon_ore","quantity":1300},{"item_id":"silver_ore","quantity":200},{"item_id":"titanium_ore","quantity":2900},{"item_id":"tungsten_ore","quantity":7850}]