Industrial Blast Furnace

A larger smelting plant equipped with plasma injection and thermal management systems to accelerate ore reduction and alloy refinement. Increased throughput via better heat control and automation.
Level2
Build Cost308,000 cr
Build Time130s
Labor10
Power Draw2
Life Support Draw1
Salvage SmelterIndustrial BlastFurnaceContinuous CastingMillStellar FoundryComplex
OutputBasic Iron Smelting
Crafting Time0.27s
ItemQuantity
Iron Ore10
ItemQuantity
Steel Plate1
MaterialQuantity
Steel Plate1200
Copper Piping550
Structural Frame450
Control Node150
Heat Sink450
Plasma Injector150
View JSON Data
[{"item_id":"aluminum_ore","quantity":10200},{"item_id":"copper_ore","quantity":8550},{"item_id":"fluorine_gas","quantity":150},{"item_id":"gold_ore","quantity":300},{"item_id":"iridium_ore","quantity":150},{"item_id":"iron_ore","quantity":9100},{"item_id":"nickel_ore","quantity":900},{"item_id":"palladium_ore","quantity":300},{"item_id":"plasma_residue","quantity":300},{"item_id":"silicon_ore","quantity":2550},{"item_id":"silver_ore","quantity":1500},{"item_id":"titanium_ore","quantity":750},{"item_id":"tungsten_ore","quantity":5800}]