Focused EM Factory

Higher-throughput facility with automated board-to-coil bonding stations and integrated tuning equipment. Structural framing provides rigid mounting for superconductor arrays during assembly.
Level2
Build Cost428,000 cr
Build Time240s
Labor30
Power Draw2
Life Support Draw1
Focused EM PressFocused EM FactoryFocused EMManufactoryFocused EMOrdnance Complex
OutputManufacture Focused EM Charges
Crafting Time26.4s
ItemQuantity
Circuit Board2
Superconductor2
ItemQuantity
Focused EM Charge Pack4
MaterialQuantity
Steel Plate1600
Copper Piping750
Structural Frame700
Control Node200
Weapon Housing650
Barrel Assembly400
View JSON Data
[{"item_id":"aluminum_ore","quantity":21900},{"item_id":"copper_ore","quantity":11150},{"item_id":"fluorine_gas","quantity":200},{"item_id":"gold_ore","quantity":400},{"item_id":"iron_ore","quantity":14950},{"item_id":"nickel_ore","quantity":1400},{"item_id":"silicon_ore","quantity":3000},{"item_id":"silver_ore","quantity":400},{"item_id":"titanium_ore","quantity":1900},{"item_id":"tungsten_ore","quantity":11250}]