Flak Manufacturing Plant

Dedicated facility with parallel assembly stations for steel construction, barrel machining, and tracking module installation. Structural framing and expanded control nodes increase output while maintaining reliable interception capability.
Level2
Build Cost966,000 cr
Build Time180s
Labor16
Power Draw2
Life Support Draw1
Flak Assembly YardFlak ManufacturingPlantAnti-MissileOrdnance WorksFlak DefenseArsenal
OutputBuild Flak Cannon I
Crafting Time63s
ItemQuantity
Circuit Board2
Steel Plate4
Tracking System1
ItemQuantity
Flak Cannon I1
MaterialQuantity
Steel Plate5600
Copper Piping2800
Structural Frame2300
Control Node750
Weapon Housing2200
Barrel Assembly1550
View JSON Data
[{"item_id":"aluminum_ore","quantity":75100},{"item_id":"copper_ore","quantity":38400},{"item_id":"fluorine_gas","quantity":750},{"item_id":"gold_ore","quantity":1500},{"item_id":"iron_ore","quantity":51200},{"item_id":"nickel_ore","quantity":4600},{"item_id":"silicon_ore","quantity":9950},{"item_id":"silver_ore","quantity":1500},{"item_id":"titanium_ore","quantity":6700},{"item_id":"tungsten_ore","quantity":39750}]