Dimensional Energy Storage Plant

Expanded facility with structural frames supporting larger superconductor arrays and enhanced hull plating integration. Increased throughput handles higher volumes of null matter conditioning.
Level2
Build Cost2,700,000 cr
Build Time250s
Labor80
Power Draw2
Life Support Draw1
Void CapacitorAssembly LineDimensional EnergyStorage PlantIndustrialCapacitorManufacturingAdvanced VoidStorage Complex
OutputBuild Void Capacitor
Crafting Time139.5s
ItemQuantity
Processed Null Matter5
Shield Emitter1
Superconductor3
ItemQuantity
Void Capacitor1
MaterialQuantity
Steel Plate5050
Copper Piping2900
Structural Frame1900
Control Node700
Hull Plating1850
Reinforced Bulkhead1300
View JSON Data
[{"item_id":"aluminum_ore","quantity":142300},{"item_id":"copper_ore","quantity":22900},{"item_id":"fluorine_gas","quantity":700},{"item_id":"gold_ore","quantity":1400},{"item_id":"iron_ore","quantity":92800},{"item_id":"nickel_ore","quantity":3800},{"item_id":"silicon_ore","quantity":8300},{"item_id":"silver_ore","quantity":1400},{"item_id":"titanium_ore","quantity":24650},{"item_id":"tungsten_ore","quantity":60500}]