Cargo Container Fabricator
Basic industrial stamping and welding line for producing standardized cargo containers from steel plate and aluminum sheet. Automated press cycles and basic seam welding ensure consistent form factor.
Stats
| Level | 1 |
| Build Cost | 101,000 cr |
| Build Time | 120s |
| Labor | 9 |
| Power Draw | 1 |
| Life Support Draw | 1 |
Upgrade Path
Recipe
| Output | Build Cargo Container |
| Crafting Time | 2.4s |
Recipe Inputs
| Item | Quantity |
|---|---|
| Aluminum Sheet | 3 |
| Steel Plate | 5 |
Recipe Outputs
| Item | Quantity |
|---|---|
| Cargo Container | 1 |
Build Materials
| Material | Quantity |
|---|---|
| Steel Plate | 2350 |
| Copper Piping | 1150 |
| Control Node | 250 |
Construction
| Base Material | Quantity |
|---|---|
| Aluminum Ore | 500 |
| Copper Ore | 4450 |
| Fluorine Gas | 250 |
| Gold Ore | 500 |
| Iron Ore | 6100 |
| Silicon Ore | 250 |
| Silver Ore | 500 |
| Titanium Ore | 250 |
| Tungsten Ore | 3750 |
View JSON Data
[{"item_id":"aluminum_ore","quantity":500},{"item_id":"copper_ore","quantity":4450},{"item_id":"fluorine_gas","quantity":250},{"item_id":"gold_ore","quantity":500},{"item_id":"iron_ore","quantity":6100},{"item_id":"silicon_ore","quantity":250},{"item_id":"silver_ore","quantity":500},{"item_id":"titanium_ore","quantity":250},{"item_id":"tungsten_ore","quantity":3750}]