Advanced Lead Shielding Facility

State-of-the-art plant with redundant bonding systems, precision coolant loops, and automated quality assurance. Produces dense, interlocking lead shielding in continuous output.
Level4
Build Cost2,650,000 cr
Build Time420s
Labor25
Power Draw6
Life Support Draw1
Lead ShieldingAssembly LineReinforced LeadShielding PlantLead ShieldingManufacturingComplexAdvanced LeadShielding Facility
OutputRoll Lead Shielding
Crafting Time5.4s
ItemQuantity
Lead Sheet10
Steel Plate4
ItemQuantity
Lead Shielding4
MaterialQuantity
Steel Plate4800
Copper Piping2650
Reinforced Frame2450
Control Node950
Coolant Loop2250
View JSON Data
[{"item_id":"aluminum_ore","quantity":85200},{"item_id":"carbon_ore","quantity":44100},{"item_id":"copper_ore","quantity":61400},{"item_id":"fluorine_gas","quantity":950},{"item_id":"gold_ore","quantity":1900},{"item_id":"helium_ice","quantity":4500},{"item_id":"iron_ore","quantity":137550},{"item_id":"nickel_ore","quantity":83300},{"item_id":"nitrogen_ice","quantity":9000},{"item_id":"silicon_ore","quantity":20550},{"item_id":"silver_ore","quantity":1900},{"item_id":"titanium_ore","quantity":5850},{"item_id":"tungsten_ore","quantity":78850},{"item_id":"water_ice","quantity":4500}]